Empowering connectivity in every environment

Antenna Design That Ships

Custom RF & antenna engineering for products that have to work in the real world.

Trusted In

Common RF Challenges

Ultra‑compact enclosures and detuning effects

Coexistence across Wi‑Fi/BT/LTE/GNSS/UWB/NFC

Isolation requirements for MIMO/massive MIMO

TRP/TIS and SAR compliance challenges

Slipping timelines and certification re‑tests

How we solve them

Simulation‑led architecture & tuned integration

Advanced pattern control, isolation & efficiency optimisation

Rapid pre‑compliance testing and iteration

Documented pathways to UKCA/CE/FCC certification

DFM and factory transfer for yield‑ready production

What we deliver

End-to-end RF and antenna solutions, so you don’t have to chase multiple suppliers.

Antenna & RF subsystem design

Single/dual/multi‑band, arrays, beamforming, high isolation.

End‑to‑end product development

RF architecture, PCBs, firmware, thermal & mechanical.

Pre‑compliance test & optimisation

Conducted & OTA, TRP/TIS, detuning & coexistence.

Certification & manufacturing support

UKCA/CE/FCC, carrier pre‑tests, DFM & ramp.

Frequency & Protocol Coverage

Sub-6 GHz

LTE/5G NR FR1, CBRS, LPWAN, UHF

mmWave

24–29, 37–43, 57–71 GHz

Satcom & PNT

L/Ku/Ka terminals, GNSS L1/L2/L5

Short-range

Wi‑Fi 4/5/6/6E/7, BLE, UWB, NFC

How we work

Clear, fast, accountable

Discover

Requirements, constraints, risks, success criteria

Design

Simulation‑led design, materials and stack‑up choices

Prototype

Quick‑turn builds and tuned integration.

Test

Conducted/OTA, coexistence and detuning fixes.

Cert & Ramp

Docs, pre‑screens, DFM and factory transfer.

Typical timelines: feasibility 1–2 weeks; first prototypes 3–6 weeks.

Proof it works

Wearable GNSS + BT

Problem: Metal‑rich enclosure, detuning risk.

Result: Robust acquisition & coexistence, no size growth.

Details under NDA

FWA CPE MIMO

Problem: Isolation & efficiency under hand/edge.

Result: Stable throughput, smoother certification.

Details under NDA

Dual-Band Satcom

Problem: Pattern control & Tx/Rx isolation.

Result: Mobility‑ready terminal in harsh RF.

Details under NDA

Pre‑compliance test & optimisation

  • OTA & conducted up to mmWave bands
  • TRP/TIS, SAR mitigation, coexistence & detuning
  • Faster cycles with in‑house chambers

Industries we serve

Consumer & IoT
CPE & Infrastructure
Automotive & Transport
Aerospace & Defence
Space & Mobility
Industrial IoT

Ready to move from “it should work” to “it does work”?

NDA‑friendly. Schedule‑honest. Production‑minded.

Frequently Asked Questions (FAQs)

Can you rescue projects failing tests?

Frequently. We diagnose and recover TRP/TIS, isolation, detuning and coexistence issues

Will you sign our NDA?

Yes. We also provide a mutual NDA if preferred.

Can you support Europe‑wide?

Yes—UK‑based core team with EU support and global manufacturing partners.