Empowering connectivity in every environment
Custom RF & antenna engineering for products that have to work in the real world.








Ultra‑compact enclosures and detuning effects
Coexistence across Wi‑Fi/BT/LTE/GNSS/UWB/NFC
Isolation requirements for MIMO/massive MIMO
TRP/TIS and SAR compliance challenges
Slipping timelines and certification re‑tests
Simulation‑led architecture & tuned integration
Advanced pattern control, isolation & efficiency optimisation
Rapid pre‑compliance testing and iteration
Documented pathways to UKCA/CE/FCC certification
DFM and factory transfer for yield‑ready production
End-to-end RF and antenna solutions, so you don’t have to chase multiple suppliers.
Single/dual/multi‑band, arrays, beamforming, high isolation.
RF architecture, PCBs, firmware, thermal & mechanical.
Conducted & OTA, TRP/TIS, detuning & coexistence.
UKCA/CE/FCC, carrier pre‑tests, DFM & ramp.
LTE/5G NR FR1, CBRS, LPWAN, UHF
24–29, 37–43, 57–71 GHz
L/Ku/Ka terminals, GNSS L1/L2/L5
Wi‑Fi 4/5/6/6E/7, BLE, UWB, NFC
Clear, fast, accountable
Requirements, constraints, risks, success criteria
Simulation‑led design, materials and stack‑up choices
Quick‑turn builds and tuned integration.
Conducted/OTA, coexistence and detuning fixes.
Docs, pre‑screens, DFM and factory transfer.
Typical timelines: feasibility 1–2 weeks; first prototypes 3–6 weeks.
Problem: Metal‑rich enclosure, detuning risk.
Result: Robust acquisition & coexistence, no size growth.
Details under NDA
Problem: Isolation & efficiency under hand/edge.
Result: Stable throughput, smoother certification.
Details under NDA
Problem: Pattern control & Tx/Rx isolation.
Result: Mobility‑ready terminal in harsh RF.
Details under NDA
NDA‑friendly. Schedule‑honest. Production‑minded.
Frequently. We diagnose and recover TRP/TIS, isolation, detuning and coexistence issues
Yes. We also provide a mutual NDA if preferred.
Yes—UK‑based core team with EU support and global manufacturing partners.